Caribou North Compressor Station AlbertaCapital Cost - $6.4 MM
The
Mandate. The client needed to expand the existing Compressor Station
facility. A high level risk assessment (HAZOP) of the existing facility
was also required to assess the impact of the planned expansion.
The
Solution. GRB conducted a HAZOP review that included mechanical, electrical,
instrumentation, operations, operability and reliability issues. GRB engineered
and managed the following critical items as part of the expansion:
- Installed two 3-stage sales compressors totaling 4450HP, for a station total of 32,500HP.
- Second electrical motor control centre (MCC) building and equipment (including surveying and managing the additional lease space for these items)
- Produce water dump valves tied into the aboveground vent knockout tank
- Installed new gas detection head in all compressor buildings
- Installed secondary emergency vent system with aboveground knockout tank
- Purchased / installed new office/control room
- Purchased / installed two new computer workstations with local area network (LAN)
|