Grand Forks Oil Battery and Water Disposal Facility Grand Forks, Saskatchewan
Project
Capital Cost - $1 MM
The Mandate. The client required a new facility for oil treating, water separation and disposal at an existing oil satellite. The Solution. GRB engineered and managed procurement and installation of the facility, including: - Modifications for fuel gas take-off and ESD valving to an existing inlet header and test separator package
- 6' x 32' free water knock out, complete with a 1 million btu burner system, fuel gas scrubber and associated instrumentation
- Design and installation of a water injection building capable of handling 5000 bpd of fluid at 1000 psi discharge pressure
- Two tanks within the tank farm containment area - one 750 bbl water tank and one 400 Bbl emergency oil tank
- New 480 Volt Motor Control Centre and PLC control panel, and working with TransAlta to increase power of the existing three-phase power transformer
|