SAGD Source Water Pipeline
Cold Lake Air Weapons Range, Alberta

Project Capital Cost - $6 MM

The Mandate. The client was looking to build a new, High Density Polyethylene (HDPE) lined, steel pipeline, located on the Cold Lake Air Weapons Range, to transport brackish source water from a future multi-well pad site.

The Solution. GRB engineered and managed procurement and installation of 1.2 km of a 12 3/4" pipeline and 12.5 km of a 10 3/4" HDPE lined steel pipeline. Project details included:

  • Fabrication and installation of above ground risers with provisions for future pigging
  • Fabrication and installation of buried internally coated fittings
  • Pipeline to handle maximum operating pressure (MOP) of 8618 kPag (1250 psig) and tested at 10773 kPag (1652 psig)
  • Steel linepipe sections (~800 meters long) were tested before and after installation of the HDPE Tight Liner to validate operating pressure
  • Linepipe ditched in accordance with proper environmental practices specific to the Cold Lake Air Weapons Range and to specifications set out in environmental reports

CASE STUDIES
Beiseker Compressor Station (Coal Bed Methane)
Caribou North Compressor Station
Grand Forks Oil Battery and Water Disposal
Hayter Oil Satellite - High Water Volume Separation - Skud
Inlet Cyclone Separator
Rosevear 5-3 Oil Battery
SAGD Source Water Pipeline
Suffield D Compressor Station

 

""
Section Title
CASE STUDY
SAGD Source
Water Pipeline