Suffield D Compressor Station Alberta
Capital
Cost - $ 7 MM
The Mandate. The client was looking to optimize the compression at an existing station: - Better handling (avoid temperature and capacity issues) of lowering inlet pressure by changing from three stages of compression to four stages of compression
- Replace older equipment to minimize future downtime and repair bills.
The
Solution. GRB engineered and managed the installation of the following
equipment:
- One 3550 BHP, two stage reciprocating compressor package with a Cat G3612TA LE Driver, and an Ariel JGC/6 Compressor
- Three-phase utility power brought into site by the local utility vendor
- A transformer for hook-up of the three phase utility power
- A new electrical building containing the MCC for the K8 package
- Above ground piping and electrical cable trays
- Additional yard fencing surrounding the new compressor
- A sales trim cooler, with bypass, for use during the summer months
|